Cement quantity and cost calculator for construction projects. Calculate cement requirements for RCC, masonry, plaster, and flooring.

Calculator Settings

Feet & Inches
Meters
Select your preferred measurement unit for your project.
RCC Work
(Columns, Beams, Slabs)
Masonry Work
(Brick/Block Work)
Plaster Work
(Wall Plastering)
Flooring Work
(Floor Concrete)
Select the type of construction work for cement calculation.
1:1.5:3
1:2:4
1:3:6
1:4
1:5
1:6
Select the cement-sand-aggregate mix ratio for your work.

RCC Dimensions

feet
feet
feet
Nos.
Current market price of cement per 50kg bag
Enter current cement price for accurate cost estimation
Standard Cement Consumption:
• RCC (1:1.5:3): 6-7 bags per cubic meter
• Masonry (1:6): 0.8-1 bag per cubic meter
• Plaster (1:4): 0.16 bags per sq.m (12mm thick)
• Flooring (1:4): 0.25 bags per sq.m (25mm thick)
Important Notes:
• 1 bag of cement = 50kg = 1.25 cubic feet
• Always add 5-10% extra for wastage
• These calculations are estimates - actual may vary
• Consult with your contractor for precise requirements

CEMENT CALCULATION RESULTS

Cement Required
5
50kg bags
Including 10% wastage allowance
Selected Work Breakdown
RCC
RCC Work
1:1.5:3 mix ratio
5 bags
Cost Estimation
₹ 2,000
Based on ₹400 per 50kg bag
Note: Cost does not include sand, aggregate, labor, or other materials
Project Details
Work TypeRCC Work
Mix Ratio1:1.5:3
UnitsFeet & Inches
Quantity1 Nos.
Total Cement250 kg
Total Bags Needed5 bags
Calculation Details:
• Volume = Length × Width × Thickness
• = 10ft × 0.5ft × 0.5ft = 2.5 ft³
• For RCC (1:1.5:3 mix): 6.5 bags per cubic meter
• 2.5 ft³ = 0.0708 m³
• Cement required: 0.0708 × 6.5 = 0.46 bags
• With 10% wastage: 0.46 × 1.10 = 0.506 ≈ 1 bag
Pro Tip: For accurate cement calculation, always consider the specific mix design, cement brand, and local construction practices. These calculations provide a good estimate for planning and budgeting purposes.